276°
Posted 20 hours ago

Peak Performance Planner. Undated Life Planner. Daily, Mindfulness, Reflections. A5 size. Start Anytime. (Turquoise)

£32.755£65.51Clearance
ZTS2023's avatar
Shared by
ZTS2023
Joined in 2023
82
63

About this deal

If you have a 16-25, Senior, Two Together, HM Forces, Veterans or Disabled Persons Railcard, you can also get 1/3 off First Class Off-Peak and Super Off-Peak fares A number of key spots in the Peak District also have links to public transport particularly the train network. Your best best is to get to Manchester and hop on a train from there. Tips for planning your day trip to the Peak District Creation of walking and cycling path via the former railway from Coombs Road (Bakewell) to Church Lane (Rowsley) Coombs Road (Bakewell) Running To Church Lane (Rowsley) c) Be directed away from flood risk area and seek to reduce overall risk from flooding within the National Park and areas outside it, upstream and downstream Removal of Condition 2 on NP/WED/688/332/LB (Formation of 2 holiday flats) to allow for the use as a single residential dwelling North Lees Hall

Installation of four 3 element Yagi antennas and one 1.8 meter dish antenna on the existing tower with two associated GPS antennas mounted on an existing equipment building for BBC... Arqiva Transmitting Station To comply with the policy measures will be required that go beyond building regulations requirements. But for householder applications in particular, the measures can be things that are won’t add significant expense and are easily achieved, while improving the sustainability of property in the longer term. Installation of renewable energy system (wind & solar) to power the existing ventilation system of the composting toilets Binn Green Public Toilets Conversion of the ground floor store rooms into a study, a proposed first floor, north west, gable addition and a detached garage and store 56 Old Dam Please refer to the local validation list and ensure that you provide the information required on this list otherwise your application cannot be validated. Main types of planning permission

Contact Us

Non-material amendment to application NP/DDD/0112/0075 to include the addition of one copper cladding panel to front (south) elevation. Addition of solid front door to south... Goldcrest Engineering Alterations to house to include conversion of garage to bedroom and erection of garage with studio over Birchenlee Change of use of grassed area to provide off road parking spaces for residential use Land To West Of Parsons Gate Non-material amendment to NP/SM/1017/1043 - addition of metal handrail to external steps. Pump Farm

New and improved footpath network: creation of circular accessible route within the grounds of Ilam Hall, including new paths leading to bridge crossings over the River Manifold Ilam Hall Temporary change of use from agricultural workers dwelling to self catering holiday accommodation New Elm Tree Farm Storey side extension, single storey rear extension to provide ancillary accomodation and new detached garage 3 Lea RoadThe re-instatement of a lowered section of boundary wall around Holy Trinity Church, Holy Trinity Church The details of current and decided planning applications are available to view online at portal.peakdistrict.gov.uk. The other reason is that a planner gives you a structure and proven framework that already works for thousands of people. So you don’t have to reinvent the wheel from scratch or wonder what you should write in your planner. Expect traditional peak planning approaches to die on the vine when it comes to legacy technologies. According to the latest supply chain trends of peak season , they already have: Monthly goals, reward, feel-good action list, skills and habits to master, most important monthly goals with action steps, reason and reward, appointment and event calendar, ideas, notes

Listed Building consent - Removal of and upgrade of all CCTV cameras along with all redundant power supplies and cabling, digital cameras are powered through Cat 5. Section 73 application for the alteration or variation of condition 2 on 72NP/Cha.2/72/3 Perry CroftRefurbishments to school house, alterations to car park and provision of play areas Stanton In Peak Primary School Listed Building Consent - Erection of glazed link and internal alterations. Aldern House, Baslow Road Erection of 8 antennas, 3 dishes and 2 equipment cubicles Cti's Calver Peak Transmitting Station, Calver Peak

Proposed change of use of redundant buildings to stone dressing buildings Buildings On Pilhough Road To continue and extend workings for the winning and working of silica sand, silica clay and ganister Vincent House/Parsley Hay Installation of solar powered car park machine and associated base, pedestrian area and signage. Moor Lane Car Park

Neighbourhood plan

Lawful Development Certificate for an existing use - Use of builidng as an independant dwelling. The Annexe Listed Building Consent - Change of use to residential & studio Stanton In The Peak Wesleyan Reform Chapel Erection of a new storage building to provide storage facilities for the Estate Ranger Service of the National Park (following demolition of existing agricultural

Asda Great Deal

Free UK shipping. 15 day free returns.
Community Updates
*So you can easily identify outgoing links on our site, we've marked them with an "*" symbol. Links on our site are monetised, but this never affects which deals get posted. Find more info in our FAQs and About Us page.
New Comment